How much does a new bathroom cost?
Quick answer: A new mid-range bathroom, supplied and fitted, typically costs £5,500–£8,000. Budget refits start at about £3,500, and high-end bathrooms run to £11,000–£15,000+. Labour alone is usually £1,500–£4,000.
Work out your cost
Choose what you need. We'll show a typical price range and how it's made up.
Typical prices, job by job
| Job | Typical price | How long | Notes |
|---|---|---|---|
| Budget refit, small room | £2,500–£5,500 | 5–8 days | Standard suite, part-tiled. |
| Mid-range full refit | £5,500–£8,000 | 7–10 days | Average about £7,000. |
| High-end or large refit | £11,000–£15,000+ | 9–16 days | |
| Labour only, full bathroom | £1,500–£4,000 | 5–10 days | Labour is 45–60% of the total. |
| Remove old bathroom | £600–£1,000 | 1 day | |
| Tiling, supply and fit | £35–£140 per m² | 10–15 m² a day | Whole bathroom £900–£2,050. |
| Shower installation | £250–£750 | 0.5–1 day | £450–£1,500 including the shower. |
| Wet room | £4,000–£8,350 | 4–8 days | The floor must be fully waterproofed. |
| Electric underfloor heating | £60–£100 per m² | +1 day | About £300–£500 for 5 m². |
| Moving toilet or waste | £1,500–£3,000 | +1–3 days | Single source, treat as a guide. |
| Electrics: lights, fan, shaver point | £900–£1,200 | 1–2 days | Must be Part P certified. |
Bathrooms cost about 35% more in London and 15% more in the South East than in the Midlands, and 5–15% less in the North.
How to keep the cost down
- Keep the toilet and waste pipes where they are.
- Tile only the wet areas and paint the rest.
- Buy the suite in a sale, but agree this with your fitter first.
- Standard-size tiles are quicker and cheaper to fit than large format or natural stone.
- Get a fixed-price quote that lists removal, electrics and making good.
Comparing quotes
- Get two or three written quotes that cover the same work.
- Check what's included and what's extra, including materials and clearing up.
- Ask about insurance, guarantees and any registration the work needs.
- Agree payment stages. Avoid paying a large deposit up front.
- Read recent reviews. On Seconded, every review comes from a confirmed job.
Common questions
How long does it take to fit a new bathroom?
Usually 5–10 working days. Allow longer for a wet room or a new layout.
Is labour-only cheaper?
It can be, but you're responsible for ordering the right parts on time. If they're late, you still pay for the fitter's time.
How much does tiling add?
About £900–£2,000 for an average bathroom, depending on the tiles and how much wall you tile.
Is a wet room more expensive?
Yes. The floor has to be fully waterproofed and laid to a fall, so budget £4,000–£8,000 or more.
Do I need building regulations approval?
Bathroom electrics must meet Part P, and moving waste pipes may need approval. A registered electrician can self-certify their work.
Is underfloor heating worth it?
In a small bathroom it's cheap to fit, about £300–£500, and cheap to run if you set it on a timer.